06-29-2015, 04:26 PM
![[Image: P5290677_zpswd01wsbk.jpg]](http://i656.photobucket.com/albums/uu281/Aussie_T100/Yamaha%20SRV250/P5290677_zpswd01wsbk.jpg)
The brake mastercylinder, bar end weights & clutch perch were repainted with gloss black enamel and the handlebar switchgear was touched up with satin black by brush. New handlebar grips and a new brake lever were fitted.
The carbies were removed, stripped down, thoroughly cleaned and re-assembled.
![[Image: P5100342_zpshywo4y9t.jpg]](http://i656.photobucket.com/albums/uu281/Aussie_T100/Yamaha%20SRV250/P5100342_zpshywo4y9t.jpg)
![[Image: P6080772_zpsurav1sra.jpg]](http://i656.photobucket.com/albums/uu281/Aussie_T100/Yamaha%20SRV250/P6080772_zpsurav1sra.jpg)
All of the exhaust components were thoroughly cleaned and polished.
![[Image: P5110452_zpsmjyocs8h.jpg]](http://i656.photobucket.com/albums/uu281/Aussie_T100/Yamaha%20SRV250/P5110452_zpsmjyocs8h.jpg)
![[Image: P5120457_zpsckgzb69s.jpg]](http://i656.photobucket.com/albums/uu281/Aussie_T100/Yamaha%20SRV250/P5120457_zpsckgzb69s.jpg)
![[Image: P5110455_zpsabewuhl0.jpg]](http://i656.photobucket.com/albums/uu281/Aussie_T100/Yamaha%20SRV250/P5110455_zpsabewuhl0.jpg)
The engine was removed and thoroughly cleaned before removing all of the external casings.
![[Image: P5140478_zps7sawgb39.jpg]](http://i656.photobucket.com/albums/uu281/Aussie_T100/Yamaha%20SRV250/P5140478_zps7sawgb39.jpg)
With the engine removed the engine bay was thoroughly cleaned.
![[Image: P5150490_zpsi46qxnka.jpg]](http://i656.photobucket.com/albums/uu281/Aussie_T100/Yamaha%20SRV250/P5150490_zpsi46qxnka.jpg)
The engine was then prepared for painting and masked up.
![[Image: P5280623_zpsbhcatmok.jpg]](http://i656.photobucket.com/albums/uu281/Aussie_T100/Yamaha%20SRV250/P5280623_zpsbhcatmok.jpg)