05-06-2020, 10:49 PM
(This post was last modified: 05-06-2020, 10:51 PM by Chief_Mechanic.)
Alright, for the last 2 days of Quarantine/Golden-Week I've put in over 16 hours on the bike.
Installed wheel bearings & oil seals, painted the wheels, wired up the digital meter (see the Acewell Meter install post), adjusted needles (still needs work), reinstalled carb, installed seat, bobbed the frame, and lowered the headlight.
Here, just check out the pics:
(To see original size pics, right click and choose 'view image')
Now I need to install turn signals, mirrors and some kind of license plate bracket. I also need to continue working on the Air-Fuel mixture. Probably have to jump up a size or two in jets.
Installed wheel bearings & oil seals, painted the wheels, wired up the digital meter (see the Acewell Meter install post), adjusted needles (still needs work), reinstalled carb, installed seat, bobbed the frame, and lowered the headlight.
Here, just check out the pics:
(To see original size pics, right click and choose 'view image')
Now I need to install turn signals, mirrors and some kind of license plate bracket. I also need to continue working on the Air-Fuel mixture. Probably have to jump up a size or two in jets.
My Bikes: SRV250, Ninja 250R